Repeat volumes, handled as a schedule
A repeat order only goes wrong when each one is treated as a new order. This page describes how a bulk programme is set up so that every repeat order starts from the same confirmed specification rather than from someone’s memory of the last batch.
How a programme is set up
Four things get fixed once, in writing, and then every repeat order is measured against them instead of argued about again.
-
1
The specification is pinned
The version of the product that will be produced is written down and agreed. On every subsequent order the same version is the reference point.
- You receive
- A written specification sheet with a version reference you can quote back to us.
- Change control
- Any change to the specification after it is pinned is a new project, not a change order. That is deliberate.
-
2
Volume and rhythm are set
Per-quarter or per-container consumption, and a production window that lines up with it, so the factory builds ahead of your need rather than after it.
- You provide
- Average consumption and the seasonality, if there is any.
- We do
- Turn that into a production and shipment schedule that clears your warehouse before peak.
- Open items
- Order quantity bands and lead time [TBD].
-
3
The same quality gate runs every time
Verification does not get lighter because the product is familiar. The same checks apply to the tenth batch as to the first.
- What that means
- Same production line, same inspection standard, same approval record, unless a change was formally approved.
- Where to check it
- Supplier access, qualification and QA
-
4
Shipping is planned against the calendar
Consolidation and loading are planned at the start of the programme, not at the point at which the container happens to be ready.
- Open items
- Incoterms, consolidation thresholds and destination charges [TBD].
What we need from you
Four inputs are enough to price and space a bulk programme. If you only have some of them, say so — we would rather build the schedule around the gaps than wait.
-
1
The product, by reference
A catalogue reference is enough to start. If the bulk version differs from the catalogue item, tell us what changes at volume.
-
2
Quantities and rhythm
Per order and per year, plus any seasonality. A rough rhythm is more useful than a precise forecast that changes every month.
-
3
Destination market
Voltage, plug type, and the certification the destination market requires. This drives packaging, documentation and production, so it is worth stating early.
-
4
A working contact for approvals
Someone who can approve a sample or a specification change within a few working days. Programmes rarely stall for technical reasons; they stall waiting for an approval.
Before you commit
Minimum order quantity, payment terms, lead time and consolidation thresholds are marked [TBD] above because they depend on the product and the destination and cannot be stated honestly as a single site-wide number. Send the product reference and the destination market and those figures will be quoted against your actual programme.